The car is completely disassembled, made a complete defektovka all units and we proceed to repair the frame and order the necessary parts for this project. On the frame a lot of work to be done, because in some places she rusted through will be to repair the sore spots, to change all the brackets cushion body, all three pipes, all fasteners shock absorbers and springs, plus mount the motor
The frame, all new tubes, hoses, body cushions, rebuilt axles, shock absorbers, all the silent blocks, universal joints, even the springs had to be changed
The body came from the painting do a full noise-vibro isolation and install the wiring, since the body was completely empty and starting to put everything together
have already made and turned on the finish line, made the engine, stainless steel hinges, installed dodger G63AMG made air conditioner radiator, made anti-corrosion body parts, brought in order of wiring and finalized noise isolation, left to install the ventilation 2011goda cabin, AMG exhaust and retract the ceiling in alcantara
Finished installing the interior and optics from 2001 to 2011 year, dashboard, steering wheel, lock, obf, comand ntg2.5, rear camera 📸, climate, ventilation seats, speakers Harman/Kardon, lighting throughout the car, sills AMG with lighting, daytime running lights, headlights with xenon, mirrors 13 years, car alarm with auto start and other nice little things
Completely renovated frame, replaced the body, installed a new running gear, the interior of 2011, a full dodger, the original G63AMG, all stainless steel hinges, a ceiling covered in black alcantara, full anticorrosive treatment, auto start, sill lighting, camera, exhaust, engine tuning, and many other useful little things